(68) A.The hub
B.The bridge
C.The router
D.The proxy
(69) A.Ethernet
B.Token Bus
C.Token Ring
D.DQDB
(70) A.X.25
B.ATM
C.FDDI
D.SMDS
●In low-speed network,it is usually adequate to wait for congestion to occur and then react to it by telling the source of packets to slow down.In high-speed networks, this approach often works poorly, because in the (71) between sending the notification and notification arriving at the source, thousands of additional (72) may arrive.In ATM network , a major tool for preventing (73) is (74) control.When a host wants a new virtual (75) ,it must describe the traffic to be offered and the service expected.
(71) A.interval
B.time
C.slot
D.delay
(72) A.packets
B.cells
C.message
D.files
(73) A.collision
B.congestion
C.drop
D.delay
(74) A.flow
B.admission
C.traffic
D.time
(75) A.path
B.rout
C.circuit
D.way
2007下半年計(jì)算機(jī)軟件水平考試模擬試題匯總
希望與其他軟考考生進(jìn)行交流?點(diǎn)擊進(jìn)入軟考論壇>>>
更多信息請(qǐng)?jiān)L問:考試吧軟件水平考試欄目
北京 | 天津 | 上海 | 江蘇 | 山東 |
安徽 | 浙江 | 江西 | 福建 | 深圳 |
廣東 | 河北 | 湖南 | 廣西 | 河南 |
海南 | 湖北 | 四川 | 重慶 | 云南 |
貴州 | 西藏 | 新疆 | 陜西 | 山西 |
寧夏 | 甘肅 | 青海 | 遼寧 | 吉林 |
黑龍江 | 內(nèi)蒙古 |